MIL-PRF-12048E
4.2 First article inspection. When a first article inspection is required, it shall be performed on
one complete test kit. The inspection shall include the examination of 4.4 and the testing of 4.5.
4.3 Conformance inspection. Conformance inspection shall include the examination of 4.4.
4.4 Examination. Each test kit shall be examined for the deficiencies listed in Table I. The
presence of one or more defects shall be cause for rejection.
TABLE I. Examination.
No. Examination Description
Reqt Para
Method
101 Components and consumables not as specified
3.4.1 & 3.4.2 Visual/Doc.
Visual/Doc./SIE
102 Container not as specified
3.4.4,
3.4.4.1,
3.4.4.3
103 Component placement not as specified in loading
3.5
Visual/Doc.
diagram
104 Weight not as specified
3.4.4.2
Visual/Doc./SIE
105 Protection devices not as specified
3.4.3 & 3.8.2 Visual/Doc.
106 Accessibility not as specified
3.8, 3.8.1, Visual/Doc./SIE
3.8.2
107 Labeling not as specified
3.10
Visual/Doc.
108 Identification marking not as specified
3.10.1
Visual/Doc.
109 Materials not as specified
3.3, 3.3.1- Visual/Doc.
3.3.3
110 Deterioration prevention and control not as specified
3.3.2
Visual/Doc.
111 Dissimilar metals not protected against galvanic
3.3.2
Visual/Doc.
corrosion as specified
112 Treatment/painting not as specified
3.9
Visual/Doc.
113 Visibility device not as specified
3.6.3
Visual/Doc./SIE
Doc. = Documentation, SIE = Standard Inspection Equipment
4.5 Tests. The tests shall be conducted in the following order: 4.5.1.1 through 4.5.1.5
(Performance), 4.5.3.1 (Transportability), 4.5.3.3 (Shock), 4.5.2.5 (Water Resistance), 4.5.3.2
(Vibration), 4.5.2.1 through 4.5.2.4 (High/Low Temp - Storage/Operational)
4.5.1 Performance. Performance testing shall be conducted at room temperature (20 ± 2 °C)
unless otherwise specified.
4.5.1.1 Fuel temperature. The test shall be conducted in accordance with API-MPMS Chapter
7 - Section 1. Missing components or supplies required for the test, failure to complete, or to
meet applicable criteria shall constitute failure of this test. The equipment and materials needed to
complete this test shall be recorded.
6
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business